The Data Center Isn't the Whole Footprint
A data-center campus can depend on substations, transmission, generation or fuel infrastructure, water and sewer systems, roads and other facilities beyond the building parcel.
![[ALT TEXT]](https://cdn.prod.website-files.com/6a4ce2573c5e347b9450aeb1/6aaabd62c8d1477b9bfe10a0_ocg_data_center_whole_footprint.png)
What This Graphic Shows
The physical footprint of a data center is larger than the building itself. A large campus can depend on substations, transmission lines, generation or fuel infrastructure, water and wastewater systems, roads and other supporting facilities. Some infrastructure may sit on the same parcel; some may be located miles away.
Power infrastructure can include new or expanded substations, transmission facilities and utility interconnections. Some Ohio projects are also paired with dedicated or behind-the-meter generation, adding generating equipment, gas connections and related facilities.
Water infrastructure depends on cooling design and the local system. A project may need water mains, storage, pumping capacity, wastewater connections or other improvements even when routine cooling-water consumption is relatively low.
Transportation and construction access can require road improvements, turn lanes, staging areas and heavy-truck access. These effects can occur before operations begin and may involve different public agencies from those reviewing the building.
Land-use comparisons should therefore define the system boundary. The data-center parcel, campus plus dedicated infrastructure, and broader shared utility system are different measurements.
Ask: What new infrastructure is required, where will it be located, who will own it, who else will use it, and who will pay for it?
Key Takeaway
Define the footprint before measuring it. The data-center parcel, dedicated supporting infrastructure and broader shared utility system are different boundaries.
Verification Status:
Verified — Current
Last Verified:
September 16, 2026
Sources
Review the sources used to support this visual.
DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers
Explore More
Continue exploring the issue or return to the complete OCG Visual Library.